DETAILED ESTIMATE
DOOR - 1000*2100 |
SI NO |
DESCIPTION |
N0 |
L (m) |
B (m) |
D (m) |
QTY |
1. |
Earth work Excavation |
1 |
20.8 |
0.80 |
0.95 |
15.8 m3 |
|
|
|
|
|
|
|
2. |
P.C.C 1:4:8 |
1 |
20.8 |
0.80 |
0.20 |
3.32m3 |
|
|
|
|
|
|
|
3. |
R.R.masonry C.M 1:6 |
|
|
|
|
|
|
Footing |
1 |
20.8 |
0.60 |
0.75 |
9.36 m3 |
|
Basement |
1 |
20.8 |
0.40 |
0.60 |
4.99 m3 |
|
|
|
|
|
|
14.35m3 |
|
|
|
|
|
|
|
4. |
Earth Filling inside the Room |
1 |
5.80 |
3.80 |
0.45 |
9.90 m3 |
|
|
|
|
|
|
|
5. |
B.W
in C.M 1:4 |
|
|
|
|
|
|
Super Structure |
1 |
20.8 |
0.20 |
3.00 |
12.4 m3 |
|
Parapet Wall |
1 |
20.8 |
0.20 |
0.60 |
2.4 m3 |
|
Deduct Door-1 |
1 |
1.00 |
0.20 |
2.10 |
-0.42 m3 |
|
|
|
|
|
|
14.5 m3 |
|
|
|
|
|
|
|
6. |
R.C.C Roof slab 1:2:4 |
1 |
6.40 |
4.40 |
0.15 |
4.2 m3 |
|
|
|
|
|
|
|
7. |
Plastering with C.M 1:3 |
|
|
|
|
|
|
Outside room 2(6.4 + 4.4)= 21.6 |
1 |
21.6 |
- |
3.70 |
74.0 m3 |
|
Inside room 2(6 + 4)= 20 |
1 |
20.0 |
- |
3.00 |
64.8 m3 |
|
Deduct Door -1 |
1 |
1.00 |
- |
2.10 |
-2.10 m3 |
|
|
|
|
|
|
136.7 m3 |
|
|
|
|
|
|
|
8. |
Flooring |
1 |
6.00 |
4.00 |
- |
24.0 m2 |
|
|
|
|
|
|
|
9. |
White Washing Same quantity for plastering. |
|
|
|
|
136.7 m3 |